European Projects, Further

ARTEMIS - Internet of Energy for Electric Mobility (IoE)

Date: 01/05/2011 - 30/04/2014

Coordinator: 
STIFTELSEN SINTEF

Consortium:
40 partners from 10 nations 

Volume: 
44,5 Mio. €


Project:
The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circuits, sensors, processing units, storage technologies, algorithms, and software. The IoE will implement the real time interface between the power network/grid and the Internet. The grid will increasingly rely on smaller, locally distributed electricity generators and storage systems that are based on plug & play principles. Power network devices and loads at the edge can be charged or connected on any source of energy being solar, wind, or hydroelectric. Reference designs and ESs architectures for high efficiency innovative smart network systems will be addressed with regard to requirements of compatibility, networking, security, robustness, diagnosis, maintenance, integrated resource management, and self-organization. The future smart grid will converge with the Internet based on standard interfaces, and a physical infrastructure to support electric mobility and the efficient distribution of power and information.

 


IoE Website

Cordis Website

General information

ARTEMIS - Internet of Energy for Electric Mobility (IoE)

Postal address ECPE e.V.:
ECPE European Center for Power Electronics e.V.
Ostendstrasse 181
D-90482 Nuremberg, Germany
Phone: +49 (0)911 81 02 88-0

Subscribe to the ECPE News

 

© 2018 ECPE European Center for Power Electronics e.V.